COMPLETED PROJECTS

Since 1904 Raeco, Inc. has been a leader in specialty product manufacturing of concrete floor repair, leveling materials, and ceramic tile mortars.

Below is a partial list of projects which have been completed using a significant amount of Raeco products. This is by no means a complete list, as there are literally thousands of projects completed using the Raeco product line.

Starbucks Corporate Headquarters
(2002-2003)

Location: Seattle, WA
Products: R-50, Level-Flex

This building, the original downtown Sears headquarters, was severely damaged in an earthquake. R-50 and Level-Flex were used to restore and repair subfloor damage, and bring this historic structure back to life.




Cornish College of Arts Building
(2002-2003)

Location: Seattle, WA
Products: SLU




Marion Oliver McCaw Performance Center
(2003)

Location: Seattle, WA
Products: R-25, R-50





Main Fire Station
(2003)

Location: Redmond, WA
Product: R-50





Kennedy Jenks Consulting
(2003)

Location: Federal Way, WA
Product: R-25





Washington State Capital/Legislative Building
(2003)

Location: Olympia, WA
Product: R-25





Seahawks Stadium
(2002)

Location: Seattle, WA
Product: R-25, R-50
Area: 300,000+ s.f. @ 1/8" to 3/4"





501 Elliot
(2002)

Location: Seattle, WA
Product: R-25, R-50
Area: 45,000 s.f. @ 1/8" to 3/4"





Highline Community Hospital
(2002)

Location: Burien, WA
Product: R-50, SLU
Area: 45,000 s.f. @ 14,500 s.f. @ 1/4" to 1 1/2"





Millenium Tower
(2002)

Location: Seattle, WA
Product: R-25, R-50, Buttercoat
Area: 58,000 s.f. @ 1/8" to 1 3/4"





Seattle Art Museum
(2002)

Location: Seattle, WA
Product: R-25





Onyx Building
(2001)

Location: Bellevue, WA
Product: R-50,
Area: 28,500 S/F, 0" to 4",





Nortel Networks Building (2001)

Location: Bellevue, Washington, R-50, O TO 3" THICK,
21,100 S/F.

Union Station (2001)
Location: Seattle, Washington / Product: R-50 Overlayment & SLU / Area: 1/4" AVG @ 1 1/2" Average

Evergreen Estates (2000)
Location: Bellevue, Washington / Product: R-50 Overlayment / Area: 1/4" Avg. 12 Units

Lakeridge Square (2000)

Location: Redmond, Washington/ Product: R-25 Underlayment & R-50 Overlayment / Area: varying depths

Sunset Complex (1999)

Location: Bellevue, Washington / Product: R-25 Underlayment & R-50 Overlayment / Area: 23,500 s.f. @ varying depths

Cedar Court (1999)

Location: Redmond, Washington / Product: R-50 & R-25 / MULITIPLE UNITS AT varying depths

Fred Hutchinson Cancer Center (1999)

Location: Seattle, Washington / Product: R-25 Underlayment & R-50 Overlayment / Area: 9,000 s.f. @ 1/8" Average

Childrens Hospital (1999)
Location: Seattle, Washington / Product: R-25 Underlayment / Area: 18,000 s.f. @ 1/8" Average

Weyerhauser (1999)
Location: Federal Way, Washington / Product: R-25 Underlayment / Area: 72,000 s.f. @ 1/4" Average

Starwood Hotel (1999)
Location: Seattle, Washington / Product: R-25 Underlayment / Area: 54,000 s.f. @ 1/4" Average

Microsoft-Pinehurst (1999)

Location: Redmond, Washington / Product: R-25 Underlayment / Area: 108,000 s.f. @ 1/8" Average

University of Washington Fisheries Building (1999)

Location: Seattle, Washington / Product: R-25 Underlayment / Area: 52,000 s.f. @ 1/8" Average & 10,000 s.f. @ 5/8” Average

King Street & 4th Ave. (1999)
Location: Seattle, Washington / Product: R-25 Underlayment / Area: 35,000 s.f. @ 3/16" Average

Safeco Field- Baseball Statium (1999)

Location: Seattle,Washington / Product: R-25 Underlayment /Area: 7,200 s.f. @ 1/8" Average

Safeco Field - Parking Garage (1999)

Location: Seattle, Washington / Product: R-50 Overlayment /Area: 250,000 s.f. @ 1/4" Average

Year 1999 Oregon STATE UNIVERSITY - HEALTH BUILDING (1999)
Location: Portland, Oregon / Product: R-25 Underlayment / Area: 22,000 s.f. @ 1/8" Average

Year 1999 Intel Campus (1999)

Location: Hillsboro, Oregon / Product: R-50 Overlayment /Area: 100,000 s.f. @ 1/4" Average

Nike World - Parking Garage (1999)

Location: Beaverton, Oregon / Product: R-50 Overlayment / Area: 65,000 s.f. @ 1/4" Average

Nike World Campus - Buildings C-D-E-F (1999)

Location: Beaverton, Oregon / Product: R-25 Underlayment / Area: 25,000 s.f. @ 1/8" Average

Washington State University, Thompson Hall (1999)
Location: Pullman, Washington / Product: R-25 Underlayment & Level-Flex Underlayment / Area: 53,500 s.f. @ 1/2" Average

Fujitsu Microchip Plant (1999)
Location: Gresham, Oregon / Product: R-25 Underlayment & R-50 Overlayment / Area: 12,000 s.f. @ 1/4" Average

Two Center Point (1999)
Location: Lake Oswego, Oregon Product: R-25 Underlayment & R-50 Overlayment / Area: 24,000 s.f. @ 1/4" Average

Peter Cort Building (1999)
Location: PORTLAND, Oregon / Product: R-25 Underlayment / Area: 7,500 s.f. @ 1/8" Average

Virginia Mason Hospital (1999)

Location: Seattle, Washington / Product: R-25 Underlayment / Area: 5,000 s.f. @ 1/4" Average


Ballard High School (1999)

Seattle Tennis Club (1999)

Location: Seattle, Washington / Product: R-25 Underlayment / Area: 6,000 s.f. @ 1/8" Average

Intel Corporation (1999)
Location: Hillsboro, Oregon / Product: R-50 Overlayment / Area: 44,000 s.f. @ 1/4" Average

World Trade Center (1999)
Location: Seattle, WA / Product: R-25 Underlayment / Area: 68,000 s.f. @ 1/4" Average

Starbucks, Inc.. - Corp. Headquarters (1998)
Location: Seattle, WA / Products: R-25 Underlayment & Level-Flex Underlayment / Area: 180,000 s.f. @ 1/4" Average

Nike Corp. Parking Structure (1998)
Location: Hillsboro, Oregon / Product: R-50 Overlayment / Area: 28,000 s.f. @ 1/4" Average

Chimicoom Middle School (1998)
Location: Chimicoom, Wa / Product: Buttercoat / Area: 30,000 s.f. @ 1/8" Average

University OF Washington (1998)
Location: Seattle, Wa / Product: R-25 Underlayment / Area: 52,000 s.f. @ 1/8" Average

Icos Building #4 (1997)
Location: Bothell, Wa / Product: Feather Spread /Area: 8,800 s.f. @ 1/8" Average

Western State Hospital (1997)
Location: Tacoma, Wa / Product: Self Leveling Underlayment / Area: 141,000 s.f. @ ½” Average

JOBS COMPLETED 1996 AND PRIOR

Year 1997 Panasonic Micro-Chip Plant Location: Puyallup, WA / Product: R-25 Underlayment / Area: 36,000 s.f. @ 1/8" Average.


Year 1997 U.S. WEST Location: Bellevue, WA / Product: Self Leveling Underlayment & Feather Spread / Area: 122,000 s.f. @ 1/4" Average.


1996 Niketown Stores Location: Various Locations / Products: R-50 Overlayment & Buttercoat / Area: 75,000 s.f. @ 1/4" Average.


Year 1996 QFC Grocery Store Location: Seattle, WA / Product: R-25 Underlayment / Area: 27,000 s.f.@ 1/4" Average


Year 1996 KCPQ - TV Station Location: Seattle, WA / Product: R-50 Overlayment / Area: 50,000 s.f. @ 1/4" Average


Year 1996 King County Justice Center Location: Kent, WA / Products: Self Leveling Underlayment & Buttercoat / Area: 127,000 s.f. @ 1/4" Average


Year 1995 Evergreen State College Location: Olympia, WA / Products: R-25 Underlayment & Buttercoat / Area: 11,500 s.f. @ 1/4" Average


Year 1995 Seattle School District Location: Seattle, Washington / Products: R-25 Underlayment & Buttercoat / Area: 220,000 s.f. @ 1/8" Average


Year 1995 Nordstrom Stores Location: Various Locations / Product: R-25 Underlayment & Buttercoat / Area: 186,000 s.f. @ 1/4" Average.


Year 1995 Microsoft Corp. Location: Redmond, Washington / Product: R-25 Underlayment, R-50 Overlayment & Buttercoat / Area: 375,000 s.f. @ 1/4" Average.


1994 Central Kitsap School 12,000 S/F Silverdale Wa. R-25 Latex Underlayment Used Here To Prepare Floors For Hardwood.

OTHER LARGE JOBS Year 1994:


Mossyrock School, Mossyrock, Wa., The Gap Department Store 4000 S/F Seattle, Wa., The Boeing Company 4000 S/F Auburn, Wa., King County Courthouse Seattle, Wa., Larry's Market Seattle, Wa., Sodo Center Multiple Floors Seattle, Wa., Kinko Printing Warehouse 10,000 S/F Seattle, Wa., National Guard Armory Buckley, Wa., Bellevue High School, Bellevue, Wa.

Year 1993 Immunex Building 8,400 S/F Redmond, Wa. Multiple Raeco Products Used.

Other Large Jobs In 1993: Safeway Super Market 6,500 Renton, Wa., Sacred Heart Hospital 8,000 S/F., Washington State University 10,000 S/F Pullman, Wa., Hayden Super Market, Bellingham, Wa.


Year 1992 Union Station 40,000 S/F Tacoma , Wa., R-25 Underlayment Up To 1 Inch Thick Installed


Year 1992 Project: Hawthorne Elementry School Everett, Wa. R-50 & R-25 Products Used Here.


Year 1991 Seattle Art Museum 60,000 S/F Seattle, Wa., R-25 Used To Level Slabs Prior To Installation Of Flooring Products.


Other Large Jobs In 1991 Include


Washington State Convention Center 60,0000 S/F,

University Of Washington Atmospheric Sciences Building, Seattle, Wa., R-50 Latex Overlayment, Anchor Building R-50 Latex Overlayment. University Of Washington Medical Center, Seattle, Wa., R-25 Latex Underlayment.


Year 1989 And 1990 Atx Gateway Tower 50,000 S/F

Raeco R-25 Installed In Elevator Corridors & Restroom Multiple Floors.


Year 1989 Pacific 1st Building 10,000 S/F Seattle Wa. R-25 Latex Underlayment Installed 2" To Feather Edge.


Year 1988 University Of Washington Hospital 7,500 S/F Seattle Wa. Raeco R-25 Latex Underlayment And R-25 Buttercoat Installed Up To 1 Inch Thick.


Year 1986 Veterans Adminstration Hospital Portland, 20,000 S/F R-25 & Buttercoat Products Installed On Corridors And Operating Rooms.


Year 1985 Arcade Plaza Building Seattle Wa, 40,000 S/F R-25 Buttercoat Used To Smooth Out Floors.


Year 1984 Wedgewood Apartment Project, Seattle, Wa., R-25 Used On Multiple Decks On The Second And Third Floors. Corrected Drainage Problem, Elastomeric Deck Surface Applied Over Top.


Year 1982 First Interstate Bank Building, Seattle, Wa., Multiple Products Used On Multiple Floors Of This Project. This Project Took Two Years And Ended In 1984.


Year 1981 Large Boeing Project, Renton, Wa., Boeing Repair Building 4-21-1 Using R-25 Latex Underlayment Up To 2" Thick.


Other Job Of Size 1981: Sherton Hotel Seattle, Wa., 4 Seasons Hotel, Seattle, Wa.

Year 1980 University Of Washington Hospital, Seattle, Wa., A Large Amount Of Corridors Repaired With R-25 Latex Underlayment Up To 3/4" Thick. Another Job Completed Of Size: Boeing, Everett, Wa.

Year 1979 Continental Furniture Company 10,000 S/F Seattle Wa., 10,000 S/F Raeco R-25 Latex Underlayment Installed To Fix Existing Floor To Receive Carpet.

Year 1977/1978 - 4 Th And Yesler Building, Seattle, Wa., Extensive Raeco R-25 Latex Underlayment Installed On All Floors Of This Remodel To Bring Floors To Proper Condition To Receive Finished Flooring.

Year 1976 Pacific Northwest Bell Building ,Seattle, Wa., Raeco R-25 Latex Underlayment Installed On Executive Level To Level Floors To Receive Carpet.

Year 1976 William Mckay Ford 20,000 S/F Seattle, Wa., William O. Mckay Ford 20,000 S/F Installed Using R-50 Latex Concrete. Installed On Second Floor Area For Parking Cars.

Year 1975 Northgate Shopping Mall 90,000 S/F Seattle, Wa., Norhtgate Shopping Mall 90,000 S/F Installed From 4" Thick To A Feather-Edged, Using R-25 Latex Concrete Underlayment.


Year 1973 Bank Of California Building, Seattle, Wa., Bank Of California Building In Downtown Seattle, Wa. Thousands Of S/F Of Concrete Fixed And Leveled With Raeco R-25 Latex Concrete Underlayment

© 1999-2003 Raeco, Inc.     915 S. Carstens Place   Seattle, WA. 98108
email: info@raecoinc.com

ph: 206.763.1335
toll free: 877.763.1330